
The Ministry of Transport and Infrastructure continues to weave iron nets all over Istanbul. Continuing its efforts for a more comfortable and faster transportation of 16 million citizens, the Ministry announced that the 3 metro lines have come to an end. In the statement, “Istanbul Airport-Eyup (Gokturk)-Kagithane-Gayrettepe metro line is 98% complete, Pendik-Tavsantepe-Sabiha Gokcen is 99.05%, Basaksehir Cam and Sakura Hospital-Kayasehir Metro line is 94.99% complete.”
Istanbul Airport-Eyup (Gokturk)-Kagithane-Gayrettepe, Pendik-Tavsantepe-Sabiha Gokcen and Basaksehir Cam and Sakura Hospital-Kayasehir Metro Lines have come to an end.
3 MORE METRO LINES WILL BE OPENED
General Directorate of Infrastructure Investments (AYGM) shared the good news that concerns all Istanbul residents on its official twitter account. The following statements were included in the tweet, where it was stated that 3 metro lines were approaching the end: ‘We continue to weave Istanbul with iron nets! Counting the days for the opening; Our Istanbul Airport-Eyup (Gokturk)- Kagithane-Gayrettepe, Pendik- Tavsantepe-Sabiha Gokcen and Basaksehir-Cam and Sakura Hospital-Kayasehir Metro Lines will be at the service of our nation very soon!’
CLOSE TO BE FULLY COMPLETED
In the shared image, the ending rates of the metro lines were included. According to this; Istanbul Airport-Eyup (Gokturk)-Kagithane-Gayrettepe metro line is 98% complete, Pendik-Tavsantepe-Sabiha Gokcen is 99.05%, Basaksehir Cam and Sakura Hospital-Kayasehir Metro line is 94.99% complete.
Source: Beyazgazete / Translated by Irem Yildiz